Due to changes, The current set up needs to have the local repeater moved.
Anybody along Chung Wah or 2 houses off the main ridge that runs palmerston who is interested in setting up as a repeater. Would be looking at a 12-15m ..
Pm .. other wise the current gear is going to the burner to be dismantled and handed out.
I guess as you are effectively in competition with the likes of Telstra etc and local ISP's there may have been a bit of back office pressure to remove the offending item ...
That as it may be but others ( ie Telstra , ISP's ) may view it differently ..
It happened here in Perth - similar scenario - local Council threatened to bulldoze the mast and confiscate eqipment as it was deemed "an illegal wireless transmission station".
Turns out a certain Telco leaned very heavily on local council.
Why dont you contact your ild neiughbour Paul, Hes a rigger by trade. Get him to check the mast and certify it. Hence the application for a permit should recieve less resistence.
elo all yes will the intentions were at their best !!! at the moment im getting some info on all the requirements need to do this without ne PAIN !!(Council) that way if its done to requirements and specs should all be sweet as.
"You will need to engage the services of a building certifier in private industry to get the required Building Permit before construction commences. You will need to provide the Building Certifier with:- i) details of the proposed development (including drawings); ii) structural engineer’s certification for the structural design; and iii) certified plumbing design (for any plumbing work)."
Also
"A Building Permit is valid for two years commencing from the date on which it is granted. This time may be extended if an application is made to the Building Certifier before the expiration of the time for which the permit is valid."
so in a nut shell the strucure has to have a engineer’s certification which the 30m mast have just have to contact the makers (which is hills I think) for the paper work on the designs, details on the placement of the mast with full drawings a mesurements etc and all basic paper work
THEN
"Before Construction Commences The building certifier should have: • approved all plans • forwarded the Building Permit and accompanying plans to the Director, Building Control, Department of Infrastructure, Planning and Environment; • checked that building insurance has been taken out which must be evidenced by the appropriately stamped policy (refer HBCF details over the page); and • informed the builder of the appropriate mandatory notification stages (inspections)."
theres more to it than that, but after I talked to DIPE the other day I was advised to contact the private certifer for all the details on what they need and was told to get all paper work done before you contact them to save on some $ dollars $
30m in a back yard might be a bit big - but ham dudes have had 18m in there yards for years so 18/20m might be the way to go